The FlowlinePro Multiphase Flow Simulation Suite
The online version of FlowlineProSS is now production ready!
FlowlineProSS multiphase flow simulator
FlowlineProSS brings a step up in accuracy and ease of use—online, no installs.
Based on Dr. Ove Bratland’s hybrid three-phase approach, it’s the first to integrate mechanistic models, all-parameter dimensional analysis, and neural nets—a combination that reduces model bias and widens validity, yielding more trustworthy results.
The FlowlinePro System
FlowlinePro is a comprehensive suite of four integrated applications designed to support advanced flow assurance analysis:
- FlowlineProSS: Early-phase flow assurance simulation
- FlowlineProTransient: Transient Flow Simulation for later project phases
- FlowPatternAnalyzer: Flow regime study and visualization
- ErosionAnalyzer: Safe operational limits
FlowlineProSS: Steady-State Flow Assurance
FlowlineProSS is a cloud-based simulator built on a hybrid computational framework that integrates mechanistic modeling, extended dimensional analysis, and neural networks. It supports early-phase design, slugging mitigation, and erosion analysis with intuitive guidance and expert support. Local installations are available upon request.
Key capabilities include:
- Simulation of single-phase, two-phase, and three-phase flow
- Slug-limit curve plotting and erosion-driven velocity limits
- Browser-native interface with automated feedback and shareable projects
These are the benefits
- No installation required – start immediately via any modern browser
- Built-in guidance and visual feedback simplify onboarding and troubleshooting
- Works smoothly even on low-spec devices—computations run in the cloud
- Expert support available for configuration and flow assurance consulting
- Secure download of all results and files for local analysis
Features
- Hybrid simulation engine: Mechanistic modeling + Dimensional analysis + Neural networks
- Slug-limit curve plotting for smarter slugging mitigation
- Advanced erosion module using DNVGL-RP-O501 criteria
- Flow regime visualization with elevation-based color plots
- Pre-configured examples from some of the most famous real subsea installations
Training
- Onsite & online workshops led by senior flow assurance experts, including Dr. Ove Bratland—the author of the most widely used books in the field
- Access to the full flow assurance course taught at the National University of Singapore (NUS), consistently ranked among the top global universities and widely regarded as Asia’s best
- Dr. Bratland himself taught the NUS course using the same ebooks available here, ensuring continuity and depth
- Tailor-made courses available, often built around the specific systems and challenges your project team is working on
- Please contact us to discuss training options and availability
Want to discuss further and perhaps try it out? Please contact us – we offer both online and onsite demonstrations, training and consultation.
If you are a university professor, we are open to letting your students run multiphase or single-phase exercises with FlowlineProSS.